Artist - Jay Adams
Song - Oh, Yes!
Album - The Vacation EP
151 plays
[Flash 9 is required to listen to audio.]

“Oh, Yes! (Produced by Straight Flush Music)” - Jay Adams

I haven’t spoken about this at all on my blog, but I am releasing an EP on Sunday, September 4th, 2011. That’s this Sunday. The EP is called “The Vacation.” I wrote the entire EP and recorded it on Saturday. I mixed most of it yesterday and I will be doing some tweaking for the rest of the week until the release. 

Another thing that I didn’t talk about on this blog was the passing of my Grandmother two weeks ago. I kept it to myself, for the most part. I needed to deal with it. This EP dealing with those emotions. If you were around during the past two weeks, you know everything that I’m talking about, even if it’s hidden behind the guise of a good time. Mainly, this record that I’m releasing today.

I miss my Grandma dearly, and this song stems from a situation that happened after everything was all said and done. After the funeral and whatnot. I won’t get into some deep breakdown of the song, because there are things that I’d rather not discuss outside of music. Hell, I didn’t even fully explain what I was feeling outside of a bravdo-like rap. There is a true emotion behind the words, though. It takes a special person to cipher through and find them.

Without further adieu: “Oh, Yes!”

Download: Hulkshare

(Source: morejaylesswar)

Reblogged via: morejaylesswar on Monday August 29, 2011 at 2:04 PM with 15 notes



  1. morejaylesswar reblogged this from thejayadamsproject
  2. morejaylesswar reblogged this from thejayadamsproject
  3. magazinestand reblogged this from morejaylesswar and added:
    x StraightFlush Music x...Vacation. 4 days & counting…
  4. incogniri reblogged this from morejaylesswar
  5. thejayadamsproject reblogged this from morejaylesswar
  6. morejaylesswar posted this