Song - Precious
Album - From Losers To Leaders
240 plays
Artist: Jay Adams
Title: Precious
Album: From Losers To Leaders
Affiliations: Leaderboard
Written by: J. Adams
Engineered by: Jay Adams for Leaderboard Studios
Original Song: “Say Yes” - Floetry
Artwork by: Kayla
Finally, we have the official release of “Precious.” This is the first released song off of my project “From Losers to Leaders.” I’ve been talking about this song for a very long time. I believe that it’s one of the best songs that I’ve ever done in my entire life. Yes, the entire course of my life. I’m pretty much all talked out over this song. I’m just ready to release it. There has been a lot of suspense building going on. Honestly, I’m not even sure if that worked yet. I guess we’ll figure that out with the downloads and feedbacks.
This record tells a story about everything going on in my life. It starts with my past and goes to my present. I’ve never candidly spoken about the things that are going on with my team and the rift between us. It’s a silent rift because no one seems to address it at all, so this is the only time it’s been spoken about. I don’t want you to think we’re weak at the foundation, though. We’re working around whatever the situations may be. The only thing that matters is the music, right?
Download: “Precious” - Jay Adams | ALT LINK
Wednesday March 16, 2011 at 5:06 PM
I really don't know how to start this. What's better than ironic sarcasm? It got your reading this far, right? Okay, really: This is the official blog for all things Jay Adams. I'll be writing here about everything involving my music and what's going on with myself as an artist. I really hope you enjoy. Also, I have a Twitter that you can follow as well. This layout doesn't offer the option to put that there with the other sites. How lame? They have Bebo but not Twitter? That's really wack. Get with the times! I'm kidding. Thanks to the creators of this layout. I'd be assed out without them.
thejayadamsproject or cestlaculture
@morejaylesswar
nike.theory
niikkeeess
jayvadams[at]gmail.com
morejaylesswar



