Song - To Those In Last Year (feat. Mic G)
Album - The Jay Adams Project
40 plays
Artist: Jay Adams ft. Mic G
Title: To Those In Last Year
Album: The Jay Adams Project
Affiliations: Leaderboard/GRAM Game Entertainment
Produced by: Mic G
Written by: J. Adams, M. Grayer
Engineered and Mixed by: J. Adams, M. Grayer
Cover Art by: JB
Contrary to popular belief: We actually recorded this song last year. This is not a song about the new year. I think those are corny. Seriously, who gets on a record talking about “Yea! 2011 is my year!” Those kind of rappers irk me. I try not to say the year or my age in my songs because I want them to be timeless. You can’t transcend time if you’re putting it out all over the record.
So here we are, the second record for Leaderboard Thursday! As I said in the last post: This is the week of Mic G. He produced this and went in on the second verse. I posted two videos (here and here) of us working on this track. It’s pretty much a track that I wanted to scrap, but after rerecording my verses and remixing it, it came out as a track I definitely approve of! I truly hope you enjoy this as much as I did mixing it.
I’ve included “Jezebel” produced by Skye Allen as a bonus track!
Download:
MediaFire
Previous:
“Wake Up (Produced by Mic G)” - Mic G ft. Skye Allen
Bonus:
“Jezebel (Produced by Skye Allen)” - Jay Adams
Thursday January 20, 2011 at 8:08 PM
I really don't know how to start this. What's better than ironic sarcasm? It got your reading this far, right? Okay, really: This is the official blog for all things Jay Adams. I'll be writing here about everything involving my music and what's going on with myself as an artist. I really hope you enjoy. Also, I have a Twitter that you can follow as well. This layout doesn't offer the option to put that there with the other sites. How lame? They have Bebo but not Twitter? That's really wack. Get with the times! I'm kidding. Thanks to the creators of this layout. I'd be assed out without them.
thejayadamsproject or cestlaculture
@morejaylesswar
nike.theory
niikkeeess
jayvadams[at]gmail.com
morejaylesswar



