Artist - Jay Adams
Song - What A Night (feat. Quik Kash, Skye Allen & Mic G)
Album - Leaderboard Thursdays
340 plays
[Flash 9 is required to listen to audio.]

Title: What A Night
Artists: Jay Adams, Skye Allen, Quik Kash, Mic G
Album: Leaderboard Thursdays
Affiliations: Leaderboard/GRAM Game Entertainment
Produced by: Skye Allen
Written by: J. Adams, D. Davenport, A. Jones, M. Grayer
Engineered and Mixed by: J. Adams, D. Davenport
Cover Model: Raven B
Photo by: Raven B
Cover Art by: JB 

This is possibly one of the best songs I’ve ever done in my entire life. How can you front on something this great? I try to remain as humble as I possibly can, but when we drop stuff like this, it’s hard not to feel like I just might be the shit. I don’t want to put a lot of hype on this song because over-hyped things usually fail. I’ll say this much: It is the best song that you will ever hear in your entire life.

We again have Raven B on the cover. She’s become the face of our set, as I told you when I posted the cover yesterday. Our set tells a wonderful story, so I need you to go back and listen to “The League of Extraordinary Gentlemen” again. Listen to them both together. First The League and then What A Night. I hope you get the story in the music. I promise you that it is nothing short of genius.

I’m sounding really cocky in this post. Let’s hope this song can back it up.

Download:
LimeLinx | zSHARE | MediaFire | MEGAUPLOAD 

Thursday November 11, 2010 at 5:01 PM
Tagged as - leaderboard thursdays. produced by skye allen. collab. mic g. quik kash. music. raven b. jb.